NEWSROOM

SUPCON SOLAR Delingha 50MW Tower CSP Plant Connected to the Grid
Release date:2018-12-30

At 20:18, December 30th ,2018, SUPCON SOLAR Delingha 50MW molten salt tower CSP plant, a mega project at an altitude of 3017 meters, successfully connected to the grid as scheduled. 

Project Background:

SUPCON SOLAR Delingha 50MW molten salt tower CSP plant, one of China's first batch of CSP demonstration projects, is installed with a 7-hour thermal storage system and designed to generate 146 GWH electricity annually. The project launched on March 15th 2017, which is designed and constructed based on SUPCON SOLAR's independent technologies, over 95% equipment are domestically sourced.